Mon-Fri: 07:00 - 17:00

Sat & Sun: CLOSED

Our Feedback

Customer satisfaction is key.

Call Today 0845 163 0999

24hr Breakdown

SCHEDULE A QUOTATION

Heavy machinery or production zones are the backbone of the nation, and in the realm of machinery, cranes can be considered the heart. It helps in smooth operations and utmost convenience. However, only hiring lifting equipment in Brighton, such as a crane, is not enough. To ensure flawless operations and reduce downtime, you must plan the pre-lift. 

Why does Pre-Lift Planning Matter? 

Lowers Operational Risks 

Preparing the site for the crane includes considering factors such as wind conditions, crane stability, and load weight distribution. It helps identify potential hazards and eliminate them. 

Lowers Downtime 

Preparing the site even before bringing the crane allows the workers perform their tasks without unnecessary interruptions. This streamlined operation helps minimise downtime and meet deadlines efficiently. 

Optimise Resource Allocation

Pre-lift planning means planning the operations from beginning to end. It helps you to dig deeper into available resources and plan crane capacity, lifting gear, or skilled personnel accordingly. It helps to avoid last-minute adjustments or scrambling to secure additional equipment, which often breaks the budget. 

What Are the Factors You Must Consider For Pre-planning? 

Understanding the Requirements of Your Project 

To prepare the site for lifting equipment in Brighton, first assess your project’s requirements. Consider factors such as the load’s weight and size, lifting distance, etc. Faulty judgment of load size or weight can lead to catastrophic errors during the actual lift.

Site Capability and Other Factors 

Not all sites can withstand heavy cranes, which can lead to fatal accidents. To prevent it, you must prepare the site. ensure that the ground is stable and even, and that all pathways are free from obstacles, power lines and overhead obstructions. 

Selecting the Right Equipment 

Choosing the right equipment is key to ensuring smooth operations and optimal results. To that end, evaluate factors such as crane capacity, reach, and the type of lifting gear needed. A minor misjudgment can lead to safety issues and operational downtime. 

Lifting Gear and Tools

Along with the crane, safety gear must be carefully selected to meet its needs and avoid mishaps. It includes slings, shackles, and hoists. The right gears help avoid falls and further mistakes. 

Tips On Preparing the Site for Lifting Equipment in Brighton

Clean the Area Carefully 

Thorough cleaning of the area is mandatory for proper crane placement and operation. Remove all vehicles, debris, and any other structures that could obstruct. 

Place Barriers To Prevent Unauthorised Entry 

Placing barriers or warning signs around the operational site is essential to prevent trespassing or unauthorised entry. It provides safety to both the public and the workers involved.

Through Inspection of the Equipment 

Examine all crane parts, rigging equipment, load rating, cables and chains before starting operations. It allows for identifying any discrepancies and taking the right measures. 

The importance of preparingthe site for lifting equipment in Brighton can’t be overstated. It ensures optimal safety and smooth operations. 

Are you looking for a crane that meets the specific requirements of your project? Connect with us. At MH Mechanical Handling Ltd, we have a wide range of cranes, electric chains, hoists and wire rope hoists to meet the diverse demands of our clients. 

Book your equipment now.